Difference between revisions of "Category:Release Notes"

From WeBWorK_wiki
Jump to navigation Jump to search
Line 21: Line 21:
   
 
==== Previous releases ====
 
==== Previous releases ====
* [[Release_notes_for_WeBWorK_2.10]] and PG 2.10 Merged with master: December, 2014
+
* [[Release notes for WeBWorK_2.10]] and PG 2.10 Merged with master: December, 2014
* [[Release_notes_for_WeBWorK_2.9]] and PG 2.9 Merged with master: June 20, 2014
+
* [[Release notes for WeBWorK_2.9]] and PG 2.9 Merged with master: June 20, 2014
* [[Release_notes_for_WeBWorK_2.8]]. Merged with master on December 20, 2013.
+
* [[Release notes for WeBWorK_2.8]] and PG 2.8 Merged with master on December 20, 2013.
* [[Release notes for WeBWorK 2.7 |Release notes for 2.7]] and PG 2.7 -- (2.7 merged to master on June 30, 2013 )
+
* [[Release notes for WeBWorK 2.7]] and PG 2.7 Merged with master on June 30, 2013
   
 
* [[Release notes for WeBWorK 2.5.1 |Release notes for WeBWorK 2.6 (master)]] and PG 2.6 (formerly 2.5.1.1):stable code: https://github.com/openwebwork/webwork2 branch: master
 
* [[Release notes for WeBWorK 2.5.1 |Release notes for WeBWorK 2.6 (master)]] and PG 2.6 (formerly 2.5.1.1):stable code: https://github.com/openwebwork/webwork2 branch: master

Revision as of 15:26, 25 April 2016

WeBWorK 2

Current release

If you are tracking the master branch, then the command

cd /opt/webwork/webwork2
git branch 
   *master
git pull

will update your code base. Similarly for the pg and library code.

Read the release notes for necessary configuration changes for webwork2.

PG and the library problems seldom need configuration changes

Previous releases

PG Language

WeBWorK 1

Pages in category "Release Notes"

The following 62 pages are in this category, out of 62 total.

R